Which Regulations Apply to Commercial Construction Waste?
The primary federal environmental programs that may affect construction waste include:
- Resource Conservation and Recovery Act
- Clean Water Act
- Clean Air Act asbestos requirements
- Toxic Substances Control Act
- Federal universal waste rules
- Used-oil management standards
- Disposal facilities
- Recycling
- C&D debris
- Hazardous waste
- Asbestos
- Stormwater
- Waste hauling
- Local diversion requirements
RCRA and Hazardous Construction Waste
The Resource Conservation and Recovery Act, or RCRA, establishes the primary federal framework for hazardous waste. A business that generates waste has the responsibility to determine whether that waste is hazardous. EPA’s hazardous waste generator guidance explains the requirements that apply to different generator categories. Potential construction-related hazardous waste can include certain:- Solvents
- Paint wastes
- Chemical products
- Contaminated debris
- Lead-containing waste
- Mercury-containing material
Generator Status Matters
RCRA requirements change depending on how much hazardous waste a site generates. Federal categories include:- Very small quantity generators
- Small quantity generators
- Large quantity generators
- Accumulation
- Container management
- Emergency planning
- Recordkeeping
- Employee training
- Off-site shipment
Hazardous Waste Manifests and Transportation
Certain off-site hazardous-waste shipments require EPA’s hazardous waste manifest system. The manifest tracks regulated hazardous waste from the generator through transportation to the receiving treatment, storage, recycling, or disposal facility. Do not assume the waste hauler takes over all legal responsibility once material leaves the job site. Generators have their own compliance responsibilities. Verify:- Waste classification
- Transporter credentials
- Destination facility
- Manifest information
- Returned documentation
Are Site Waste Management Plans Required by Law?
There is no single federal site waste management plan regulation requiring the same plan on every U.S. commercial construction project. A construction waste management plan may instead be required by:- State regulation
- Local ordinance
- Permit condition
- Owner specification
- Construction contract
- Sustainability certification
- Institutional purchasing requirements
- Expected waste streams
- Estimated quantities
- Materials to be reused
- Materials to be recycled
- Disposal destinations
- Hazardous-waste procedures
- Responsible personnel
- Documentation requirements
Separate Hazardous Waste From Ordinary Debris
A general construction debris container is not a substitute for a hazardous-waste management system.
Waste such as:
- Regulated asbestos-containing material
- Certain PCB waste
- Hazardous chemical waste
- Certain contaminated materials
Asbestos Requirements on Commercial Projects
Commercial demolition and renovation require particular attention to asbestos.
EPA’s asbestos NESHAP applies broadly to institutional, commercial, and industrial facilities.
EPA requires a thorough inspection of the affected facility or portion of the facility before covered demolition or renovation work begins.
Depending on the project and quantity of regulated asbestos-containing material, additional requirements can include:
- Agency notification
- Trained personnel
- Controlled removal
- Wetting
- Leak-tight packaging
- Proper transportation
- Approved disposal practices
Watch for PCBs in Older Buildings
Older commercial buildings can contain PCBs in materials or equipment. One example is fluorescent light ballasts manufactured through 1979. EPA advises that PCB-containing ballasts require separate handling and appropriate disposal under applicable Toxic Substances Control Act requirements. Older buildings can also contain PCBs in certain:- Caulk
- Sealants
- Electrical equipment
Manage Fluorescent Lamps as a Separate Waste Stream
Many fluorescent and other mercury-containing lamps can be managed under EPA’s universal waste regulations. Federal universal waste categories currently include:- Batteries
- Certain pesticides
- Mercury-containing equipment
- Lamps
- Aerosol cans
Lead Rules Depend on the Project
Lead is another area where regulations are frequently oversimplified. EPA’s Renovation, Repair and Painting Rule does not automatically apply to every ordinary commercial building. It primarily covers qualifying pre-1978 housing and child-occupied facilities. Worker protection is different. OSHA’s construction lead standard applies to construction work where employees may be occupationally exposed to lead, including demolition, renovation, paint removal, and handling lead-containing material. Projects involving older coatings should evaluate both environmental disposal requirements and employee-exposure requirements.Don’t Forget Construction Stormwater
Waste management extends beyond what enters a debris container.
Stormwater flowing across a construction site can transport:
- Sediment
- Concrete washout
- Debris
- Oil
- Grease
- Chemicals
- Sanitary waste
- Storm drains
- Ditches
- Streams
- Surface water
Manage Concrete Washout Separately
Concrete truck and equipment washout should not drain freely across a job site. Washwater can be highly alkaline and contain:- Cement
- Fine solids
- Metals
- Additives
Keep Used Oil in Proper Containers
Construction equipment and maintenance activities can generate used petroleum or synthetic oils. EPA’s used-oil management standards require businesses to use appropriate containers or tanks, keep them in good condition, and label them Used Oil. Leaks and spills must be addressed appropriately. Do not mix used oil with solvents or other waste without understanding how that changes its regulatory status. Used oil recycling is often preferable to disposal when available.Sort Ordinary Construction Materials
Once regulated waste streams are removed, the remaining C&D material becomes much easier to manage. Common recyclable or recoverable materials may include:- Concrete
- Metals
- Cardboard
- Clean wood
- Asphalt
- Certain drywall
- Fixtures
- Doors
- Architectural components
Use Clearly Designated Collection Areas
A well-designed commercial site can separate:- General C&D debris
- Metal
- Concrete
- Cardboard
- Reusable material
- Universal waste
- Hazardous waste
- Emergency routes
- Pedestrian traffic
- Equipment movement
- Deliveries
Maintain Waste Documentation
A commercial construction project’s waste records may include:- Waste determinations
- Manifests
- Weight tickets
- Recycling receipts
- Disposal receipts
- Asbestos records
- Universal waste documentation
- Inspection records
- Stormwater records